The closures will affect the QEII bridge and the EAST tunnel of the A282 on several occasions from Saturday, April 26 to Monday, April 29, with deviations during the night.
National Highways has advised motorists to review the updates, since schedules can change according to climatic conditions.
The Dartford Crossing, which connects Dartford in Kent with Thurrock in Essex through the A282, is a key transport route on the Thames river.
These closures are necessary for continuous maintenance, but can change depending on climatic conditions.
Saturday April 26 – Sunday April 27
A282-NorthBound
A282 Dartford Crossing East Tunnel in North direction
Tunnel closure for contraflow worker 9.30pm – 5am
Fun through Highways England Network
A282-Sudbount
A282 Bridge qeii closure of the road to the south
Set in the east tunnel at 10 pm – 5am
Sunday April 27 – Monday, April 29
A282-NorthBound
A282 Dartford Crossing East Tunnel in North direction
Tunnel closure for 10 pm maintenance work – 5.30 am
Fun through National Highways Network